October 2024 Trivia
The answer is A. Limitations on the grid are slowing down solar projects.
As it says in the article, “The nonprofit Midcontinent Independent System Operator (MISO), which runs the grid in 15 states, must study if transmission infrastructure can handle electricity from each proposal and what upgrades the project developer might need to pay for. There’s a long line of projects that want to connect to a grid that’s already overtaxed.”
MCEA knows how important our power grid is to building reliance on clean energy. Check out our work on the Cardinal Hickory Creek transmission line – which is finally operational!